Work has slowed down on the boat because I needed to start two others. The remaining projects are small, usually taking 15 minutes to 1/2 an hour.
Taping
exterior seam

1"
tape - Note natural curve.
Trapped
air
Sanded
Fixing
above trapped air. New glass patched in.
Set
up for end pour
hatch
hardware
Spackle
trowel to keep from drilling through the side of the boat
Three
boats in progress. Expedition Single, Night
Heron and Expedition Single
[Previous]
Back to "Building Expeditions Single"
©1998 Please
Send E-Mail regarding this page to:
Nick Schade