Strip Building the Expedition Single Sea Kayak

February 13 and 14, 1998


I didn't have the camera for several days, but you didn't miss anything too interesting.

The last section waiting to be filled.

The last strip was going to be too small to handle so I glued two together so I could deal with a bigger piece.

The deck is done.

The forms flipped over to do the hull.

Three strips on either side.


[Previous][Next]

Back to "Building Expeditions Single

©1998 Please Send E-Mail regarding this page to:

Nick Schade

Email Guillemot Kayaks