Getting Over the Chine - microBootlegger Sport - E15
Hand beveling the chine strip and then filling in the bottom.
Hand beveling the chine strip and then filling in the bottom.
Stripping up the side to the chine.
After truing up the top edge of the waterline cut, I rip some accent strips and install them.
Continuing with the stripping. Using a robo-bevel to fit the strips.
Continuing with the stripping. Using a robo-bevel to fit the strips.
Installing the first strips on my microBootlegger Sport sea kayak. Discussion about keeping all the matching strips organized and in order.
Canceled Due to COVID
Better luck in 2021
Join me with Chesapeake Light Craft as OkoumeFest morphs into a full-on two-day waterfront celebration of small boat culture that will:
I will once again be attending Canoecopia supporting Chesapeake Light Craft. Said to be the largest paddlesports show in North America, it is a great event to see what is going on in paddlesports of all kinds. I usually am out front of the booth doing some sort of building demonstration. I'm not sure what I'll be doing this year, but it is sure to be interesting.